Fit out of an Aircraft Hanger

Fit out of Air Leasing's Hanger
Client: Air Leasing

Project: Fit out of an aircraft hanger with mezzanine and partitioning

Included: Mezzanine, partitioning, ceilings, glass partitioning, specialist handrail and specialist porthole windows in the doors, plastering and decorating, electrics

Contractor Team: 3 mezzanine installers,  2 partitioning and ceiling fitters, 2 glass partitioning installers, 2 electricians, 1 plasterer and 1 decorator

Project Duration: 5 weeks

Date Completed: 2016

Office Mezzanine Design Rendering For Aircraft Hanger 02
Office Mezzanine Design Rendering For Aircraft Hanger
About the Project

Air Leasing appointed Cubex Contracts because their new purpose built hanger required a mezzanine to house offices and a customer viewing area. It was necessary to create a solution that minimised the footprint of the extra requirements so we could maximise the space in front for the renovation of aircraft.

The project included design, with a key design feature being a porthole window in all of the doors – seamless glass partitioning in the pilot briefing room and then a more cost effective glass for the partitioning on the first floor offices.  We also installed a rope design handrail for the Mezzanine as well.

mezzanine floor installation northants
Back to Project Portfolio >>