Storage Mezzanine Installation

ARP Storage Mezzanine
Client: ARP

Project: Heavy duty mezzanine floor and racking installation

Included: Additional racking, Heavy duty mezzanine floor

Contractor Team: 3 racking installers, 2 mezzanine installers

Project Duration: 3 weeks

Date Completed: September 2017

About the Project

ARP approached Cubex Contracts because they needed additional storage space, but also a floor which could take a heavier load to store palletised goods on. We proposed the installation of 198 sq metres of mezzanine to create more storage space, the relocation of two runs of existing racking in order to make room for the new floor, and then a ground and mezzanine floor level shelving system for the storage of goods.

The new mezzanine floor can take a 7.2kN fully dispersed load per metre square, which has allowed the customer to store pallets on the deck. The shelving system can take 500kg per bay and we specified 1800 wide bays to assist with dispersing the load.

mezzanine floor installation northants